Narrated videoYouTube
Structure Drives Control: Practical WBS for Infrastructure
In infrastructure projects—whether highways, water treatment plants, or rail systems—the Work Breakdown Structure, or WBS, is more than just a planning tool. It becomes the backbone of cost control, schedule development, earned value reporting, and change management. A vague WBS leads to unreliable reporting and scope creep.
